05·Insights

Notes from the model.

Technical writing from the engineers doing the work — stormwater modelling practice, regional design criteria, and what Stage 4 IFC delivery actually demands.

Hydrology · KSA

Rainfall design criteria for Saudi Arabia: IDF curves, codes & a working approach

Saudi rainfall is short, violent and badly represented by default software assumptions. How we build defensible IDF inputs for MOMRAH-compliant drainage design — including what to do when the gauge record is thin.

Read the note →
Modelling practice

HEC-RAS 2D vs InfoWorks ICM — an engineer's honest comparison

Both can model an urban catchment. They are not interchangeable. Where each tool wins on mesh control, pipe-surface coupling, runtimes and reviewer acceptance — from a team that runs both weekly.

Read the comparison →
Delivery · Procurement

Outsourcing IFC drawing production: what to demand from a subconsultant

A checklist for design managers appointing specialist wet-utility support — CDE discipline, clash ownership, drawing-control standards, and the questions that separate a safe pair of hands from a liability.

Read the checklist →
Let's connect · Start your project

Brief us on the problem.

Drop us a line and we'll come back with a scope, a fee, and a principal name on the proposal.